Eishin Campus – High School: Music School

1982 to 1985
Nihongi 112-1, Iruma-shi, Saitama Prefecture, Japan
Educational, Realized , Construction completed in 1985
A small one-story building attached to the Great Hall, with its entrace set back from the main square. Its back side forms part of the lake edge.
Client:
Higashino High School - Hisae Hosoi, Managing Director
C.E.S. staff:
Christopher Alexander, Hans-Joachim Neis, Gary Black, Ingrid Fiksdahl-King
Contractor:
Fujita Corporation, Tokyo, Japan
Project stages:
Layout on the site by clients and C.E.S. Design Development and Construction Drawings done after layout Construction management along with on-site design decisions
Content of
References