The Julian Street Inn – Shelter for the Homeless: Change orders issued by C.E.S.
09/12/1987Two change orders issued by C.E.S.; the first regards the finished level of the dining hall slab, and the second the connection of the storm drain lateral.
References
-
The Julian Street Inn - Shelter for the Homeless: Field Order - Storm drain lateral
01/01/1987
Field Order #4 notifying the general contractor of the required location change of the storm drain lateral; it includes the page of the field order with the description of the changes, and the drawing of the building permit “Plan for ...
-
The Julian Street Inn - Shelter for the Homeless: Cost-free clarifications for dining hall - Foundation & slab
30/09/1988
Two cost-free clarifications.