The Julian Street Inn – Shelter for the Homeless: Specifications
01/01/1986Two outline early drafts of specifications on the organization of them by divisions and sections. The first 6-page draft includes headings for divisions and sections, mostly with handwritten notes and insertions; the second 9-page handwritten draft starts with ‘Division 9 – Finishes’ and concludes with ‘Division 16 – Electrical’ and includes the beginnings of an organized set of specifications.
Record:
References
-
The Julian Street Inn - Shelter for the Homeless: Contract Specifications - Change Order #4
17/08/1987
22-page Change Order addressed by C.E.S. to the contractor regarding the specifications, with changes requested by owner. The proposed changes refer to the following divisions: 1 – General Requirements; 2 – Sitework; 3 – Concrete; 4 – Masonry; 5 – ...
-
The Julian Street Inn - Shelter for the Homeless: Specifications
01/01/1987
19-page draft prepared by C.E.S., defining the work to be done by the architect in connection to the set of drawings already supplied. It includes the following specifications: Excavation and sitework; Foundations and slabs; Precast panels; Columns and beams; Structural ...