The Julian Street Inn – Shelter for the Homeless: Cost-free Clarifications for entry courtyard
22/09/1988Three clarifications focused on the design of the entry courtyard which include: 1) an elevation and a plan of the entry, 2) elevations and details of the entry wall and its openings and 3) a structural connection of the wall to the concrete column of the residence hall.
Contents
-
The Julian Street Inn - Shelter for the Homeless: Cost-free Clarifications for entry courtyard
22/09/1988
-
The Julian Street Inn - Shelter for the Homeless: Cost-free Clarifications for entry courtyard
22/09/1988
-
The Julian Street Inn - Shelter for the Homeless: Cost-free Clarifications for entry courtyard
22/09/1988
References
-
The Julian Street Inn - Shelter for the Homeless: Building Permit set B of drawings for the "Building Complex" - Elevations
10/07/1987
Architectural drawing with elevations of the North, West, East and South facades of the complex.
-
The Julian Street Inn - Shelter for the Homeless: Building Permit set B of drawings for the "Building Complex" - Floor Plans
08/09/1987
Three architectural floor plan drawings: 1) Ground Floor plan; 2) Second Floor plan; 3) Roof Plan.
-
The Julian Street Inn - Shelter for the Homeless: Cost-free clarifications lists
28/11/1988
Four lists of clarifications containing: 1) Fourteen non-structural clarifications; 2) Eleven architectural revisions chosen out of the sixteen listed; 3) Twenty eight Structural revisions chosen out of the thirty two listed; 4) Contains the list of all the structural revisions ...
-
The Julian Street Inn - Shelter for the Homeless: Change Orders # 16, 16a and 16b issued by Oliver & Co.
14/12/1988
Three change orders addressing adjustments to specific finishing elements; #16 and 16a refer to the doors and windows of the residential building, and #16b to lowering the courtyard elevation among other smaller changes.
-
The Julian Street Inn - Shelter for the Homeless: Change Orders # 14, 14a, 14b and 14c issued by Oliver & Co.
20/12/1988
Four change orders referring to specific number of clarifications provided by C.E.S. and the related costs for adjusting construction details and materials.