The Julian Street Inn – Shelter for the Homeless: Cost-free Clarifications for entry courtyard
3 3) Clarification no. 13 – Connection of block wall to concrete column at entrance courtyard; cover page & one drawing
Three cost-free clarifications.
Contents
-
The Julian Street Inn - Shelter for the Homeless: Cost-free Clarifications for entry courtyard
1) Clarification no. 54 - Walls, railings and planter at entrance courtyard; cover page & two drawings
22/09/1988
-
The Julian Street Inn - Shelter for the Homeless: Cost-free Clarifications for entry courtyard
2) Clarification no. 32 - Masonry openings & lintels at entrance courtyard; cover page & four drawings
22/09/1988
-
The Julian Street Inn - Shelter for the Homeless: Cost-free Clarifications for entry courtyard
3) Clarification no. 13 - Connection of block wall to concrete column at entrance courtyard; cover page & one drawing
22/09/1988
References
-
The Julian Street Inn - Shelter for the Homeless: Building Permit drawings of set B "Building Complex" - Elevations
10/07/1987
Revised architectural drawing sheet with the north, west, east and south elevations of the complex.
-
The Julian Street Inn - Shelter for the Homeless: Building Permit drawings of set B "Building Complex" - Floor plans
3 3) Roof level
08/09/1987
Architectural design drawing sheets with floor plans of the three levels of the building.
-
The Julian Street Inn - Shelter for the Homeless: Cost-free clarifications lists
4 4) List of all structural revisions with indication on the previously approved ones
28/11/1988
Four lists of clarifications.
-
The Julian Street Inn - Shelter for the Homeless: Change Orders # 16, 16a and 16b issued by Oliver & Co.
14/12/1988
Three change orders addressing adjustments to specific finishing elements; #16 and 16b refer to the doors and windows of the residential building, and #16a to lowering the courtyard elevation among other smaller changes. There is also an early version of ...
-
The Julian Street Inn - Shelter for the Homeless: Change Orders # 14, 14a, 14b and 14c issued by Oliver & Co.
20/12/1988
Four change orders referring to sixteen clarifications provided by C.E.S. and the related costs for adjusting construction details and materials. There is also an early version of the above referenced change orders, which is dated 9-Sep-88 and comprises all four ...