The Julian Street Inn – Shelter for the Homeless: Cost-free clarifications for dining hall – Roof
01/05/1989Four clarifications on: 1) The roof sheathing construction and details; 2) The dining hall eave and soffit construction details; 3 and 4) The dining hall gable at the second floor arcade, providing finishes, stucco details and structural details of the stud wall for the gable end of the dining hall at the second floor arcade .
Contents
-
The Julian Street Inn - Shelter for the Homeless: Cost-free clarifications for dining hall - Roof
01/05/1989
-
The Julian Street Inn - Shelter for the Homeless: Cost-free clarifications for dining hall - Roof
01/05/1989
-
The Julian Street Inn - Shelter for the Homeless: Cost-free clarifications for dining hall - Roof
01/05/1989
SEE ALL Records
References
-
The Julian Street Inn - Shelter for the Homeless: Building Permit set D of drawings for the "Dining Hall" - Structural Sections and Details
10/07/1987
Structural drawing depicting sections of the Dining Hall and various details of the truss and the roof connections to walls.
-
The Julian Street Inn - Shelter for the Homeless: Building Permit set D of drawings for the "Dining Hall" - Concrete Truss
10/07/1987
Two drawings of the concrete truss with notes on reinforcement placement and construction specifications.
-
The Julian Street Inn - Shelter for the Homeless: Cost-free clarifications lists
28/11/1988
Four lists of clarifications containing: 1) Fourteen non-structural clarifications; 2) Eleven architectural revisions chosen out of the sixteen listed; 3) Twenty eight Structural revisions chosen out of the thirty two listed; 4) Contains the list of all the structural revisions ...
-
The Julian Street Inn - Shelter for the Homeless: Change Orders # 14, 14a, 14b and 14c issued by Oliver & Co.
20/12/1988
Four change orders referring to specific number of clarifications provided by C.E.S. and the related costs for adjusting construction details and materials.
-
The Julian Street Inn - Shelter for the Homeless: Reports of construction meetings - February 1989
02/02/1989
Report on the 2-Feb-1989 construction meeting. Two of the major points discussed were the concrete trusses of the Dining Hall and the exterior tile cladding of the second floor of the Residential Building, both causing a continuous delay to the ...
SEE ALL Records