The Julian Street Inn – Shelter for the Homeless: Cost-free clarifications for residential building – Heavy beams
18/11/1988Four construction clarifications specifying: 1) The anchoring of an 8″x12″ heavy beam to the second floor concrete beam; 2) The ledger beam size and placement; 3) The new connection detail of the 6″x12″ beam supporting the arcade roof to the concrete column; 4) The treatment for the day room beams and how to correct their connection to ceiling .
Contents
-
The Julian Street Inn - Shelter for the Homeless: Cost-free clarifications for residential building - Heavy beams
18/11/1988
-
The Julian Street Inn - Shelter for the Homeless: Cost-free clarifications for residential building - Heavy beams
18/11/1988
-
The Julian Street Inn - Shelter for the Homeless: Cost-free clarifications for residential building - Heavy beams
18/11/1988
SEE ALL Records
References
-
The Julian Street Inn - Shelter for the Homeless: Request for extension of contract time due to the delays outlined in the letter.
13/10/1988
-
The Julian Street Inn - Shelter for the Homeless: Letter responding to a reminder by Al DiLudovico, informing that requested information was forwarded to contractors and himself on 18-Nov-88
26/06/1989
-
The Julian Street Inn - Shelter for the Homeless: Building Permit drawings of Set R "Residential Building" - Structural system
6 6) Stud wall construction
27/08/1987
Six structural design drawing sheets.
-
The Julian Street Inn - Shelter for the Homeless: Building Permit drawings of Set R "Residential Building" - Structural system
2 2) Heavy timber details for ceilings in main lobby and entrance lobby
27/08/1987
Two structural design drawing sheets with detailing of heavy timber elements.
-
The Julian Street Inn - Shelter for the Homeless: Cost-free clarifications lists
4 4) List of all structural revisions with indication on the previously approved ones
28/11/1988
Four lists of clarifications.
-
The Julian Street Inn - Shelter for the Homeless: Change Orders # 14, 14a, 14b and 14c issued by Oliver & Co.
20/12/1988
Four change orders referring to sixteen clarifications provided by C.E.S. and the related costs for adjusting construction details and materials. There is also an early version of the above referenced change orders, which is dated 9-Sep-88 and comprises all four ...