The Julian Street Inn – Shelter for the Homeless: Cost-free clarifications for windows
11/08/1988One clarification with a two page schedule of all the windows of the building. Schedule includes number of windows per design and building, with rough opening sizes .
References
-
The Julian Street Inn - Shelter for the Homeless: Building Permit set R of drawings for the "Residential Building" - Windows, Doors & Finish Floor Plans
02/09/1987
Two architectural floor plans with indications of the types of openings as mentioned in tables of door and window types with specifications; a schedule with interior finishes is included.
-
The Julian Street Inn - Shelter for the Homeless: Building Permit set D of drawings for the "Dining Hall" - Plans and Structural Sections
10/07/1987
Structural drawing of the Dining Hall, including a floor plan, a section and elevation of the arcade, a roof framing plan and window door and finishes schedules.
-
The Julian Street Inn - Shelter for the Homeless: Building Permit set K of drawings for "Kitchen & Showers" - Plans and Structural Cross Section
10/07/1987
Architectural drawing with plans, cross section, details and window & door schedules for the kitchen and shower areas; also a copy of the previous drawing with marked up items with detailed clarifications.
-
The Julian Street Inn - Shelter for the Homeless: Change Orders # 16, 16a and 16b issued by Oliver & Co.
14/12/1988
Three change orders addressing adjustments to specific finishing elements; #16 and 16a refer to the doors and windows of the residential building, and #16b to lowering the courtyard elevation among other smaller changes.
-
The Julian Street Inn - Shelter for the Homeless: Change Order #5 issued by Oliver & Co.
09/09/1988
Change order #5 refers to changing aluminum to wood-sash windows.