The Julian Street Inn – Shelter for the Homeless: Cost-free clarifications for windows
11/08/1988One clarification with a two page schedule of all the windows of the building. Schedule includes number of windows per design and building, with rough opening sizes .
References
-
The Julian Street Inn - Shelter for the Homeless: Building Permit drawings of Set R "Residential Building" - Floor plans
2 2) Second floor
02/09/1987
Two architectural design drawing sheets, depicting floor plans with windows, doors & finishes; each one includes a floor plan with indications of the opening types in coordination with the window and door schedules.
-
The Julian Street Inn - Shelter for the Homeless: Building Permit drawings of Set D "Dining Hall" - Plans & various other
10/07/1987
Architectural design drawing sheet with floor plan, roof framing plan, elevation in conjunction with the adjacent arcade, and construction details; window, door and finishes schedules are also included.
-
The Julian Street Inn - Shelter for the Homeless: Building Permit drawings of Set K "Kitchen & Showers" - Floor plans
2 2) Marked-up copy
10/07/1987
Architectural drawing sheet with detailed plans and cross section, construction details, window & door schedules and finishes; a copy of the drawing with marked-up items and clarifications is also included.
-
The Julian Street Inn - Shelter for the Homeless: Change Orders # 16, 16a and 16b issued by Oliver & Co.
14/12/1988
Three change orders addressing adjustments to specific finishing elements; #16 and 16b refer to the doors and windows of the residential building, and #16a to lowering the courtyard elevation among other smaller changes. There is also an early version of ...
-
The Julian Street Inn - Shelter for the Homeless: Change Order #5 issued by Oliver & Co.
09/09/1988
Change order #5 refers to changing aluminum to wood-sash windows.