The Julian Street Inn – Shelter for the Homeless: Open lacework concrete trusses shot in place with gunite: Structural element analysis run for truss #3 – Floral truss
08/05/1987Truss #3 element analysis includes two parts: Part 1 contains 10 pages of initial, hand-calculated load distribution on the joints and frame-members performed on 23-Apr-1987; and part 2 contains 7 pages of computer runs studying load distribution on the joints and frame-members run on 8-May-1987.
Contents
-
The Julian Street Inn - Shelter for the Homeless: Open lacework concrete trusses shot in place with gunite: Structural element analysis run for truss #3 - Floral truss
08/05/1987
-
The Julian Street Inn - Shelter for the Homeless: Open lacework concrete trusses shot in place with gunite: Structural element analysis run for truss #3 - Floral truss
08/05/1987
References