The Julian Street Inn – Shelter for the Homeless: Building Permit set R of drawings for the “Residential Building” – Heavy Timber Details
27/08/1987Two structural drawings with information on the heavy timber elements of the building structure. Included information refers to the reflected ceiling plan at the Main Lobby, and various detail sections of the ceiling’s wooden structure and other heavy timber details.
Contents
References
-
The Julian Street Inn - Shelter for the Homeless: Building Permit set R of drawings for the "Residential Building" - Drawing Index
27/08/1987
Sheet listing the set of drawings for the Residential Building .
-
The Julian Street Inn - Shelter for the Homeless: Building Permit set R of drawings for the "Residential Building" - Framing Plans
27/08/1987
Three framing plans with additional explanatory details related to specific wood connections and construction specifications.
-
The Julian Street Inn - Shelter for the Homeless: Building Permit set R of drawings for the "Residential Building" - Cross and Longitudinal Sections
27/08/1987
Drawing with two longitudinal and two cross sections as they were revised on 27-Aug-1987.
SEE ALL Drawings
-
Pasadena Zoning Ordinance for Multi-Family Housing: Minutes of meeting on parking schemes
16/11/1987
Five pages describing the pros and cons between the various proposals presented for the four types of parking and their suggested densities and location: proposals relating to the various lot sizes of the RM-32 & RM-48 zones. Issues also discussed: ...
-
The Julian Street Inn - Shelter for the Homeless: Cost-free clarifications for residential building - Heavy beams
18/11/1988
Four construction clarifications specifying: 1) The anchoring of an 8″x12″ heavy beam to the second floor concrete beam; 2) The ledger beam size and placement; 3) The new connection detail of the 6″x12″ beam supporting the arcade roof to the ...
-
The Julian Street Inn - Shelter for the Homeless: C.E.S. invoices for subcontracting specialty construction works
25/11/1988
Two invoices relating to C.E.S. subcontracts; the first dated 31-Oct-88 refers to the arcade precast columns and the lobby ceiling, and the second dated 25-Nov-88 includes the breakdown of the tilework. The third record is an estimate of the total ...
SEE ALL Records