The Julian Street Inn – Shelter for the Homeless: Change Orders # 14, 14a, 14b and 14c issued by Oliver & Co.
20/12/1988Four change orders referring to sixteen clarifications provided by C.E.S. and the related costs for adjusting construction details and materials. There is also an early version of the above referenced change orders, which is dated 9-Sep-88 and comprises all four of them; initially proposed changes and sums had been adjusted.
References
-
The Julian Street Inn - Shelter for the Homeless: General contractor's letter forwarding fourteen proposed change orders, which being discretionary, do not allow a new contract total to be estimated, until the ones approved are agreed. Furthermore, he notifes the client that there is a list of eighteen items with cost estimates, which will be necessary to complete the job.
09/09/1988
-
The Julian Street Inn - Shelter for the Homeless: Commenting on each proposed Change Order dated 9-Sep-1988, which were included in the letter sent by Oliver & Co. on 10-Nov-88.
21/11/1988
-
The Julian Street Inn - Shelter for the Homeless: Cost-free clarifications for residential building - Heavy beams
18/11/1988
Four construction clarifications specifying: 1) The anchoring of an 8″x12″ heavy beam to the second floor concrete beam; 2) The ledger beam size and placement; 3) The new connection detail of the 6″x12″ beam supporting the arcade roof to the ...
-
The Julian Street Inn - Shelter for the Homeless: Cost-free clarifications for residential building - Roof attic ventilation & eave details
25/10/1988
Two construction clarifications specifying: 1) The ventilation of the attic in ten sketches illustrating the specifics of construction and the access points through plans, elevations, sections and calculations; 2) The frieze details of construction for both, the residence building and ...
-
The Julian Street Inn - Shelter for the Homeless: Cost-free clarifications lists
28/11/1988
Four lists of clarifications.